Access this content
Your content has been opened.
Holly Energy Partners: Pipeline Case Study has been emailed to . Entered the wrong email?
Don't see the content in your inbox?
Make sure to check your spam and other messages folders.
Can't get to your email right now?
Please enter a valid verification code.
Code sent to:
Register to access this content
By accessing content on the Water & Wastewater News Online Directory you agree to our Terms of Service and Privacy Policy; and, you acknowledge that your information may be shared with the content publisher.
Changes to operations by the collocated electrical utility assets were creating AC interference and threatening the integrity of new pipeline assets running between Northern Utah and Southern Nevada, located in extremely remote and mountainous locations. To address the challenges of monitoring AC interference spikes, MOBILTEX developed a new system for reporting AC current density readings above a predetermined threshold, allowing for trending data to be captured and ongoing optimization of AC Mitigation along the entire length of the pipeline.